30 C.F.R. § 585.600

Current through November 30, 2024
Section 585.600 - What plans must I submit to BOEM before I conduct activities on my lease or grant?
(a) You must submit a SAP, COP, or GAP and receive BOEM approval before you conduct activities on your lease or grant as set forth in the following table:

Before you:You must submit and obtain approval for your:
(1) Conduct site assessment activities on your commercial lease, such as meteorological towers or other facilities that are installed on the seabed using a fixed-bottom foundation requiring professional engineering design and assessment of sediment, meteorological, and oceanographic conditions as part of the designSAP under §§ 585.605 through 585.613 .
(2) Conduct any activities pertaining to construction of facilities for commercial operations on your commercial leaseCOP under §§ 585.620 through 585.628 .
(3) Conduct any activities on your limited lease or grant in any OCS areaGAP under §§ 585.640 through 585.648 .

(b) BOEM may waive certain types of information or analyses that you otherwise must provide in your proposed plan when you demonstrate that:
(1) Sufficient applicable information or analysis is readily available to BOEM;
(2) The coastal or marine resources that are the subject of the information requirement are not present or affected;
(3) Other factors affect your ability to obtain or BOEM's need for the required information; or
(4) Information is neither necessary nor required for a State to determine consistency with its coastal management program.

30 C.F.R. §585.600

88 FR 6430 , 1/31/2023; 89 FR 42748 , 7/15/2024