30 C.F.R. § 585.632

Current through October 31, 2024
Section 585.632 - What documents must I submit before I may construct and install facilities under my approved COP?
(a) You must submit to BSEE the documents listed in the following table:

Document: Requirements are found in:
(1) Facility Design Report30 CFR 285.701 .
(2) Fabrication and Installation Report30 CFR 285.702 .

(b) You must submit your Safety Management System, as required by 30 CFR 285.810 .
(c) These activities must fall within the scope of your approved COP. If they do not fall within the scope of your approved COP, you will be required to submit a revision to your COP, under § 585.634 , for BOEM approval before commencing the activity.

30 C.F.R. §585.632

88 FR 6430 , 1/31/2023; 89 FR 42748 , 7/15/2024