30 CFR subpart, title and/or BOEM Form (OMB Control No.) | Reasons for collecting information and how used |
(1) Subpart A, General (1010-0114), including Forms BOEM-1123, Designation of Operator and BOEM-1832, Notification of Incidents of Noncompliance | To inform BOEM of actions taken to comply with general requirements on the OCS. To ensure that operations on the OCS meet statutory and regulatory requirements, are safe and protect the environment, and result in diligent exploration, development, and production on OCS leases. To support the unproved and proved reserve estimation, resource assessment, and fair market value determinations. |
(2) Subpart B, Exploration and Development and Production Plans (1010-0151), including Forms BOEM-0137, OCS Plan Information Form; BOEM-0138, EP Air Quality Screening Checklist; BOEM-0139, DOCD Air Quality Screening Checklist; BOEM-0141, ROV Survey Report Form; and BOEM-0142, Environmental Impact Analysis Worksheet | To inform BOEM, States, and the public of planned exploration, development, and production operations on the OCS. To ensure that operations on the OCS are planned to comply with statutory and regulatory requirements, will be safe and protect the human, marine, and coastal environment, and will result in diligent exploration, development, and production of leases. |
(3) Subpart C, Pollution Prevention and Control (1010-0057) | To inform BOEM of measures to be taken to prevent air pollution. To ensure that appropriate measures are taken to prevent air pollution. |
(4) Subpart J, Pipelines and Pipeline Rights-of-Way (1010-0050), including Form BOEM-2030, Outer Continental Shelf (OCS) Pipeline Right-of-Way Grant Bond | To provide BOEM with information regarding the design, installation, and operation of pipelines on the OCS. To ensure that pipeline operations are safe and protect the human, marine, and coastal environment. |
(5) Subpart K, Oil and Gas Production Rates (1010-0041), including Forms BOEM-0127, Sensitive Reservoir Information Report and BOEM-0140, Bottomhole Pressure Survey Report | To inform BOEM of production rates for hydrocarbons produced on the OCS. To ensure economic maximization of ultimate hydrocarbon recovery. |
(6) Subpart N, Remedies and Penalties | The requirements in subpart N are exempt from the Paperwork Reduction Act of 1995 according to 5 CFR 1320.4 . |
30 C.F.R. §550.199