The table in this section lists questions concerning Oil and Gas Production Measurement, Surface Commingling, and Security.
Frequently asked questions | CFR citation |
1. What are the requirements for measuring liquid hydrocarbons? | § 250.1202(a) |
2. What are the requirements for liquid hydrocarbon royalty meters? | § 250.1202(b) |
3. What are the requirements for run tickets? | § 250.1202(c) |
4. What are the requirements for liquid hydrocarbon royalty meter provings? | § 250.1202(d) |
5. What are the requirements for calibrating a master meter used in royalty meter provings? | § 250.1202(e) |
6. What are the requirements for calibrating mechanical-displacement provers and tank provers? | § 250.1202(f) |
7. What correction factors must a lessee use when proving meters with a mechanical displacement prover, tank prover, or master meter? | § 250.1202(g) |
8. What are the requirements for establishing and applying operating meter factors for liquid hydrocarbons? | § 250.1202(h) |
9. Under what circumstances does a liquid hydrocarbon royalty meter need to be taken out of service, and what must a lessee do? | § 250.1202(i) |
10. How must a lessee correct gross liquid hydrocarbon volumes to standard conditions? | § 250.1202(j) |
11. What are the requirements for liquid hydrocarbon allocation meters? | § 250.1202(k) |
12. What are the requirements for royalty and inventory tank facilities? | § 250.1202(l) |
13. To which meters do BSEE requirements for gas measurement apply? | § 250.1203(a) |
14. What are the requirements for measuring gas? | § 250.1203(b) |
15. What are the requirements for gas meter calibrations? | § 250.1203(c) |
16. What must a lessee do if a gas meter is out of calibration or malfunctioning? | § 250.1203(d) |
17. What are the requirements when natural gas from a Federal lease is transferred to a gas plant before royalty determination? | § 250.1203(e) |
18. What are the requirements for measuring gas lost or used on a lease? | § 250.1203(f) |
19. What are the requirements for the surface commingling of production? | § 250.1204(a) |
20. What are the requirements for a periodic well test used for allocation? | § 250.1204(b) |
21. What are the requirements for site security? | § 250.1205(a) |
22. What are the requirements for using seals? | § 250.1205(b) |
30 C.F.R. §250.1200