Section 250.1200 - Question index table

The table in this section lists questions concerning Oil and Gas Production Measurement, Surface Commingling, and Security.

Frequently asked questionsCFR citation
1. What are the requirements for measuring liquid hydrocarbons?§ 250.1202(a)
2. What are the requirements for liquid hydrocarbon royalty meters?§ 250.1202(b)
3. What are the requirements for run tickets?§ 250.1202(c)
4. What are the requirements for liquid hydrocarbon royalty meter provings?§ 250.1202(d)
5. What are the requirements for calibrating a master meter used in royalty meter provings?§ 250.1202(e)
6. What are the requirements for calibrating mechanical-displacement provers and tank provers?§ 250.1202(f)
7. What correction factors must a lessee use when proving meters with a mechanical displacement prover, tank prover, or master meter?§ 250.1202(g)
8. What are the requirements for establishing and applying operating meter factors for liquid hydrocarbons?§ 250.1202(h)
9. Under what circumstances does a liquid hydrocarbon royalty meter need to be taken out of service, and what must a lessee do?§ 250.1202(i)
10. How must a lessee correct gross liquid hydrocarbon volumes to standard conditions?§ 250.1202(j)
11. What are the requirements for liquid hydrocarbon allocation meters?§ 250.1202(k)
12. What are the requirements for royalty and inventory tank facilities?§ 250.1202(l)
13. To which meters do BSEE requirements for gas measurement apply?§ 250.1203(a)
14. What are the requirements for measuring gas?§ 250.1203(b)
15. What are the requirements for gas meter calibrations?§ 250.1203(c)
16. What must a lessee do if a gas meter is out of calibration or malfunctioning?§ 250.1203(d)
17. What are the requirements when natural gas from a Federal lease is transferred to a gas plant before royalty determination?§ 250.1203(e)
18. What are the requirements for measuring gas lost or used on a lease?§ 250.1203(f)
19. What are the requirements for the surface commingling of production?§ 250.1204(a)
20. What are the requirements for a periodic well test used for allocation?§ 250.1204(b)
21. What are the requirements for site security?§ 250.1205(a)
22. What are the requirements for using seals?§ 250.1205(b)

30 C.F.R. §250.1200