You must submit verification and documentation related to: | That: |
(1) Shear testing, | (i) Demonstrates that the BOP will shear the tubular body of any drill pipe (excluding tool joints, bottom-hole tools, and bottom hole assemblies such as heavy-weight pipe or collars), workstring, tubing and associated exterior control lines and any electric-, wire-, and slick-line to be used in the well; |
(ii) Demonstrates the use of test protocols and analysis that represent recognized engineering practices for ensuring the repeatability and reproducibility of the tests, and that the testing was performed by a facility that meets generally accepted quality assurance standards; | |
(iii) Provides a reasonable representation of field applications, taking into consideration the physical and mechanical properties of the tubular body of any drill pipe (excluding tool joints, bottom-hole tools, and bottom hole assemblies such as heavy-weight pipe or collars), workstring, tubing and associated exterior control lines and any electric-, wire-, and slick-line to be used in the well; | |
(iv) Ensures testing was performed on the outermost edges of the shearing blades of the shear ram; | |
(v) Demonstrates the shearing capacity of the BOP equipment to the physical and mechanical properties of the tubular body of any drill pipe (excluding tool joints, bottom-hole tools, and bottom hole assemblies such as heavy-weight pipe or collars), workstring, tubing and associated exterior control lines and any electric-, wire-, and slick-line to be used in the well; and | |
(vi) Includes relevant testing results. | |
(2) Pressure integrity testing for sealing components, and | (i) Shows that testing is conducted after the shearing is completed and prior to opening the component; |
(ii) Demonstrates that the equipment will seal at the rated working pressures (RWP) of the BOP for 5 minutes; and | |
(iii) Includes all relevant test results. | |
(3) Calculations | Include shearing and sealing pressures for all pipe to be used in the well including corrections for MASP. |
You must submit: | Including: |
(1) Verification that the independent third party conducted a detailed review of the design package to ensure that all critical components and systems meet recognized engineering practices, | |
(2) Verification that the designs of individual components and the overall system have been proven in a testing process that demonstrates the performance and reliability of the equipment in a manner that is repeatable and reproducible, | (i) Identification of all reasonable potential modes of failure; and (ii) Evaluation of the design verification tests. The design verification tests must assess the equipment for the identified potential modes of failure. |
(3) Verification that the BOP equipment will perform as designed in the temperature, pressure, and environment that will be encountered, and | |
(4) Verification that the fabrication, manufacture, and assembly of individual components and the overall system uses recognized engineering practices and quality control and assurance mechanisms. | For the quality control and assurance mechanisms, complete material and quality controls over all contractors, subcontractors, distributors, and suppliers at every stage in the fabrication, manufacture, and assembly process. |