You must equip all units being used for well-workover operations that have both a traveling block and a crown block with a safety device that is designed to prevent the traveling block from striking the crown block. You must check the device for proper operation weekly and after each drill-line slipping operation. You must enter the results of the operational check in the operations log.
30 C.F.R. §250.611