30 C.F.R. § 250.290

Current through September 30, 2024
Section 250.290 - [Effective until 10/29/2024] What operations require approval of the Conceptual Plan?

You may not complete any production well or install the subsea wellhead and well safety control system (often called the tree) before BSEE has approved the Conceptual Plan.

30 C.F.R. §250.290