30 C.F.R. § 250.236

Current through September 30, 2024
Section 250.236 - [Effective 10/29/2024] What information must I submit with the DWOP?

Your DWOP must contain the following information, as applicable:

Information that you must include with your DWOPWhere to find the description (§)
(a) General information250.237
(b) Well or completion information250.238
(c) Structural information250.239
(d) Production safety system information250.240
(e) Subsea system and pipeline information250.241
(f) New or unusual technology information250.242

30 C.F.R. §250.236

89 FR 71112, 10/29/2024