Current through November 30, 2024
Section 90.206 - [Effective until 4/14/2025] Exercise of option or transfer samplingThe following is required until April 14, 2025:
(a) The operator shall take five valid representative dust samples for each part 90 miner within 15 calendar days after:(1) The 20-day period specified for each part 90 miner in § 90.100 ; and(2) Implementing any transfer after the 20th calendar day following receipt of notification from MSHA that a part 90 miner is employed at the mine.(b) Noncompliance with the applicable standard shall be determined in accordance with § 90.207(d) of this part.(c) Upon issuance of a citation for a violation of the applicable standard, the operator shall comply with § 90.207(f) of this part. 89 FR 28484 , 6/17/2024; 89 FR 28484 , 4/14/2025