Current through November 30, 2024
Section 75.215 - Longwall mining systemsFor each longwall mining section, the roof control plan shall specify-
(a) The methods that will be used to maintain a safe travelway out of the section through the tailgate side of the longwall; and(b) The procedures that will be followed if a ground failure prevents travel out of the section through the tailgate side of the longwall.