30 C.F.R. § 56.3130

Current through November 30, 2024
Section 56.3130 - Wall, bank, and slope stability

Mining methods shall be used that will maintain wall, bank, and slope stability in places where persons work or travel in performing their assigned tasks. When benching is necessary, the width and height shall be based on the type of equipment used for cleaning of benches or for scaling of walls, banks, and slopes.

30 C.F.R. §56.3130