Current through September 30, 2024
Section 58.35 - Categorical exclusionsCategorical exclusion refers to a category of activities for which no environmental impact statement or environmental assessment and finding of no significant impact under NEPA is required, except in extraordinary circumstances (see § 58.2(a)(3) ) in which a normally excluded activity may have a significant impact. Compliance with the other applicable Federal environmental laws and authorities listed in § 58.5 is required for any categorical exclusion listed in paragraph (a) of this section.
(a)Categorical exclusions subject to § 58.5 . The following activities are categorically excluded under NEPA, but may be subject to review under authorities listed in § 58.5 : (1) Acquisition, repair, improvement, reconstruction, or rehabilitation of public facilities and improvements (other than buildings) when the facilities and improvements are in place and will be retained in the same use without change in size or capacity of more than 20 percent (e.g., replacement of water or sewer lines, reconstruction of curbs and sidewalks, repaving of streets).(2) Special projects directed to the removal of material and architectural barriers that restrict the mobility of and accessibility to elderly and handicapped persons.(3) Rehabilitation of buildings and improvements when the following conditions are met: (i) In the case of a building for residential use (with one to four units), the density is not increased beyond four units, and the land use is not changed;(ii) In the case of multifamily residential buildings:(A) Unit density is not changed more than 20 percent;(B) The project does not involve changes in land use from residential to non-residential; and(C) The estimated cost of rehabilitation is less than 75 percent of the total estimated cost of replacement after rehabilitation.(iii) In the case of non-residential structures, including commercial, industrial, and public buildings: (A) The facilities and improvements are in place and will not be changed in size or capacity by more than 20 percent; and(B) The activity does not involve a change in land use, such as from non-residential to residential, commercial to industrial, or from one industrial use to another.(4)(i) An individual action on up to four dwelling units where there is a maximum of four units on any one site. The units can be four one-unit buildings or one four-unit building or any combination in between; or(ii) An individual action on a project of five or more housing units developed on scattered sites when the sites are more than 2,000 feet apart and there are not more than four housing units on any one site.(iii) Paragraphs (a)(4)(i) and (ii) of this section do not apply to rehabilitation of a building for residential use (with one to four units) (see paragraph (a)(3)(i) of this section).(5) Acquisition (including leasing) or disposition of, or equity loans on an existing structure, or acquisition (including leasing) of vacant land provided that the structure or land acquired, financed, or disposed of will be retained for the same use.(6) Combinations of the above activities.(b)Categorical exclusions not subject to § 58.5 . The Department has determined that the following categorically excluded activities would not alter any conditions that would require a review or compliance determination under the Federal laws and authorities cited in § 58.5 . When the following kinds of activities are undertaken, the responsible entity does not have to publish a NOI/RROF or execute a certification and the recipient does not have to submit a RROF to HUD (or the State) except in the circumstances described in paragraph (c) of this section. Following the award of the assistance, no further approval from HUD or the State will be needed with respect to environmental requirements, except where paragraph (c) of this section applies. The recipient remains responsible for carrying out any applicable requirements under § 58.6 . (1) Tenant-based rental assistance;(2) Supportive services including, but not limited to, health care, housing services, permanent housing placement, day care, nutritional services, short-term payments for rent/mortgage/utility costs, and assistance in gaining access to local, State, and Federal government benefits and services;(3) Operating costs including maintenance, security, operation, utilities, furnishings, equipment, supplies, staff training and recruitment and other incidental costs;(4) Economic development activities, including but not limited to, equipment purchase, inventory financing, interest subsidy, operating expenses and similar costs not associated with construction or expansion of existing operations;(5) Activities to assist homebuyers to purchase existing dwelling units or dwelling units under construction, including closing costs and down payment assistance, interest buydowns, and similar activities that result in the transfer of title.(6) Affordable housing pre-development costs including legal, consulting, developer and other costs related to obtaining site options, project financing, administrative costs and fees for loan commitments, zoning approvals, and other related activities which do not have a physical impact.(7) Approval of supplemental assistance (including insurance or guarantee) to a project previously approved under this part, if the approval is made by the same responsible entity that conducted the environmental review on the original project and re-evaluation of the environmental findings is not required under § 58.47 .(8) HUD's guarantee of loans for one- to-four family dwellings on trust land and on fee land within an Indian reservation and on fee land owned by the Indian Tribe outside the Tribe's Indian Reservation boundaries, under the Direct Guarantee procedure for the Section 184 Indian Housing loan guarantee program without any review or approval of the application for the loan guarantee by HUD or the responsible entity or approval of the loan guarantee by HUD before the execution of the contract for construction or rehabilitation and the loan closing.(c)Circumstances requiring NEPA review. If a responsible entity determines that an activity or project identified in paragraph (a) or (b) of this section, because of extraordinary circumstances and conditions at or affecting the location of the activity or project, may have a significant environmental effect, it shall comply with all the requirements of this part.(d) The Environmental Review Record (ERR) must contain a well organized written record of the process and determinations made under this section.61 FR 19122, Apr. 30, 1996, as amended at 63 FR 15272, Mar. 30, 1998; 68 FR 56129, Sept. 29, 2003; 78 FR 68734, Nov. 15, 2013