23 C.F.R. § 650.809

Current through September 30, 2024
Section 650.809 - Movable span bridges

A fixed bridge shall be selected wherever practicable. If there are social, economic, environmental or engineering reasons which favor the selection of a movable bridge, a cost benefit analysis to support the need for the movable bridge shall he prepared as a part of the preliminary plans.

23 C.F.R. § 650.809