The drawback office shall ascertain the final amount of drawback due by reference to the certificate of manufacture and delivery and the specific manufacturing drawback ruling under which the drawback claimed is allowable.
19 C.F.R. § 191.105
The drawback office shall ascertain the final amount of drawback due by reference to the certificate of manufacture and delivery and the specific manufacturing drawback ruling under which the drawback claimed is allowable.
19 C.F.R. § 191.105