Current through September 30, 2024
Section 5.29 - Other provisions(a)Filing requirement. Unless otherwise provided by statute, regulation or order, all filings in hydropower hearings, except those conducted by trial-type procedures, must conform to the requirements of 18 CFR part 385 , subpart T of this chapter.(b)Waiver of compliance with consultation requirements.(1) If an agency, Indian tribe, or member of the public waives in writing compliance with any consultation requirement of this part, an applicant does not have to comply with the requirement as to that agency, Indian tribe, or member of the public.(2) If an agency, Indian tribe, member of the public fails to timely comply with a provision regarding a requirement of this section, an applicant may proceed to the next sequential requirement of this section without waiting for the agency, Indian tribe, or member of the public.(c)Requests for privileged or Critical Energy Infrastructure Information treatment of pre-filing submission. If a potential Applicant requests privileged or critical energy infrastructure information treatment of any information submitted to the Commission during pre-filing consultation (except for the information specified in § 5.4 ), the Commission will treat the request in accordance with the provisions in § 388.112 of this chapter until the date the application is filed with the Commission.(d)Conditional applications. Any application, the effectiveness of which is conditioned upon the future occurrence of any event or circumstance, will be rejected.(e)Trial-type hearing. The Commission may order a trial-type hearing on an application for a license under this part either upon its own motion or the motion of any interested party of record. Any trial-type hearing will be limited to the issues prescribed by order of the Commission. In all other cases, the hearings will be conducted by notice and comment procedures.(f)Notice and comment hearings.(1) All comments and reply comments and all other filings described in this part must be served on all persons on the service list prepared by the Commission, in accordance with the requirements of § 385.2010 of this chapter. If a party submits any written material to the Commission relating to the merits of an issue that may affect the responsibility of particular resource agency, the party must also serve a copy of the submission on that resource agency.(2) The Director of Energy Projects may waive or modify any of the provisions of this part for good cause. A commenter or reply commenter may obtain an extension of time from the Commission only upon a showing of good cause or extraordinary circumstances in accordance with § 385.2008 of this chapter.(3) Late-filed recommendations by fish and wildlife agencies pursuant to the Fish and Wildlife Coordination Act and section 10(j) of the Federal Power Act for the protection, mitigation of damages to, and enhancement of fish and wildlife affected by the development, operation, and management of the proposed project and late-filed terms and conditions or prescriptions filed pursuant to sections 4(e) and 18 of the Federal Power Act, respectively, will be considered by Commission under section 10(a) of the Federal Power Act if such consideration would not delay or disrupt the proceeding.(g)Settlement negotiations.(1) The Commission will consider, on a case-by-case basis, requests for a short suspension of the procedural schedule for the purpose of participants conducting settlement negotiations, where it determines that the suspension will not adversely affect timely action on a license application. In acting on such requests, the Commission will consider, among other things:(i) Whether requests for suspension of the procedural schedule have previously been made or granted;(ii) Whether the request is supported by a consensus of participants in the proceeding and an explanation of objections to the request expressed by any participant;(iii) The likelihood that a settlement agreement will be filed within the requested suspension period; and(iv) Whether the requested suspension is likely to cause any new or subsequent license to be issued after the expiration of the existing license.(2) The Commission reserves the right to terminate any suspension of the procedural schedule if it concludes that insufficient progress is being made toward the filing of a settlement agreement.(h)License conditions and required findings.(1) All licenses shall be issued on the conditions specified in Section 10 of the Federal Power Act and such other conditions as the Commission determines are lawful and in the public interest.(2) Subject to paragraph (f)(3) of this section, fish and wildlife conditions shall be based on recommendations timely received from the fish and wildlife agencies pursuant to the Fish and Wildlife Coordination Act.(3) The Commission will consider the timely recommendations of resource agencies, other governmental units, and members of the public, and the timely recommendations (including fish and wildlife recommendations) of Indian tribes affected by the project.(4) Licenses for a project located within any Federal reservation shall be issued only after the findings required by, and subject to any conditions that may be timely filed pursuant to section 4(e) of the Federal Power Act.(5) The Commission will require the construction, maintenance, and operation of such fishways as may be timely prescribed by the Secretary of Commerce or the Secretary of the Interior, as appropriate, pursuant to section 18 of the Federal Power Act.(i)Standards and factors for issuing a new license.(1) In determining whether a final proposal for a new license under section 15 of the Federal Power Act is best adapted to serve the public interest, the Commission will consider the factors enumerated in sections 15(a)(2) and (a)(3) of the Federal Power Act.(2) If there are only insignificant differences between the final applications of an existing licensee and a competing Applicant after consideration of the factors enumerated in section 15(a)(2) of the Federal Power Act, the Commission will determine which Applicant will receive the license after considering:(i) The existing licensee's record of compliance with the terms and conditions of the existing license; and(ii) The actions taken by the existing licensee related to the project which affect the public.(iii) An existing licensee that files an application for a new license in conjunction with an entity or entities that are not currently licensees of all or part of the project will not be considered an existing licensee for the purpose of the insignificant differences provision of section 15(a)(2) of the Federal Power Act.(j)Fees under section 30(e) of the Federal Power Act. The requirements of 18 CFR part 4 , subpart M, of this chapter, fees under section 30(e) of the Federal Power Act, apply to license applications developed under this part.Order 2002, 68 FR 51121, Aug. 25, 2003, as amended by Order 769, 77 FR 65475, Oct. 29, 2012