18 C.F.R. § 35.34

Current through October 31, 2024
Section 35.34 - Regional Transmission Organizations
(a)Purpose. This section establishes required characteristics and functions for Regional Transmission Organizations for the purpose of promoting efficiency and reliability in the operation and planning of the electric transmission grid and ensuring non-discrimination in the provision of electric transmission services. This section further directs each public utility that owns, operates, or controls facilities used for the transmission of electric energy in interstate commerce to make certain filings with respect to forming and participating in a Regional Transmission Organization.
(b)Definitions.
(1)Regional Transmission Organization means an entity that satisfies the minimum characteristics set forth in paragraph (j) of this section, performs the functions set forth in paragraph (k) of this section, and accommodates the open architecture condition set forth in paragraph (l) of this section.
(2)Market participant means:
(i) Any entity that, either directly or through an affiliate, sells or brokers electric energy, or provides ancillary services to the Regional Transmission Organization, unless the Commission finds that the entity does not have economic or commercial interests that would be significantly affected by the Regional Transmission Organization's actions or decisions; and
(ii) Any other entity that the Commission finds has economic or commercial interests that would be significantly affected by the Regional Transmission Organization's actions or decisions.
(3)Affiliate means the definition given in section 2(a)(11) of the Public Utility Holding Company Act (15 U.S.C. 79b(a)(11) ).
(4)Class of market participants means two or more market participants with common economic or commercial interests.
(c)General rule. Except for those public utilities subject to the requirements of paragraph (h) of this section, every public utility that owns, operates or controls facilities used for the transmission of electric energy in interstate commerce as of March 6, 2000 must file with the Commission, no later than October 15, 2000, one of the following:
(1) A proposal to participate in a Regional Transmission Organization consisting of one of the types of submittals set forth in paragraph (d) of this section; or
(2) An alternative filing consistent with paragraph (g) of this section.
(d)Proposal to participate in a Regional Transmission Organization. For purposes of this section, a proposal to participate in a Regional Transmission Organization means:
(1) Such filings, made individually or jointly with other entities, pursuant to sections 203, 205 and 206 of the Federal Power Act (16 U.S.C. 824b , 824d , and 824e ), as are necessary to create a new Regional Transmission Organization;
(2) Such filings, made individually or jointly with other entities, pursuant to sections 203, 205 and 206 of the Federal Power Act (16 U.S.C. 824b , 824d , and 824e ), as are necessary to join a Regional Transmission Organization approved by the Commission on or before the date of the filing; or
(3) A petition for declaratory order, filed individually or jointly with other entities, asking whether a proposed transmission entity would qualify as a Regional Transmission Organization and containing at least the following:
(i) A detailed description of the proposed transmission entity, including a description of the organizational and operational structure and the intended participants;
(ii) A discussion of how the transmission entity would satisfy each of the characteristics and functions of a Regional Transmission Organization specified in paragraphs (j), (k) and (l) of this section;
(iii) A detailed description of the Federal Power Act section 205 rates that will be filed for the Regional Transmission Organization; and
(iv) A commitment to make filings pursuant to sections 203, 205 and 206 of the Federal Power Act (16 U.S.C. 824b , 824d , and 824e ), as necessary, promptly after the Commission issues an order in response to the petition.
(4) Any proposal filed under this paragraph (d) must include an explanation of efforts made to include public power entities and electric power cooperatives in the proposed Regional Transmission Organization.
(e) [Reserved]
(f)Transfer of operational control. Any public utility's proposal to participate in a Regional Transmission Organization filed pursuant to paragraph (c)(1) of this section must propose that operational control of that public utility's transmission facilities will be transferred to the Regional Transmission Organization on a schedule that will allow the Regional Transmission Organization to commence operating the facilities no later than December 15, 2001.

Note to paragraph (f): The requirement in paragraph (f) of this section may be satisfied by proposing to transfer to the Regional Transmission Organization ownership of the facilities in addition to operational control.

(g)Alternative filing. Any filing made pursuant to paragraph (c)(2) of this section must contain:
(1) A description of any efforts made by that public utility to participate in a Regional Transmission Organization;
(2) A detailed explanation of the economic, operational, commercial, regulatory, or other reasons the public utility has not made a filing to participate in a Regional Transmission Organization, including identification of any existing obstacles to participation in a Regional Transmission Organization; and
(3) The specific plans, if any, the public utility has for further work toward participation in a Regional Transmission Organization, a proposed timetable for such activity, an explanation of efforts made to include public power entities in the proposed Regional Transmission Organization, and any factors (including any law, rule or regulation) that may affect the public utility's ability or decision to participate in a Regional Transmission Organization.
(h)Public utilities participating in approved transmission entities. Every public utility that owns, operates or controls facilities used for the transmission of electric energy in interstate commerce as of March 6, 2000, and that has filed with the Commission on or before March 6, 2000 to transfer operational control of its facilities to a transmission entity that has been approved or conditionally approved by the Commission on or before March 6, 2000 as being in conformance with the eleven ISO principles set forth in Order No. 888, FERC Statutes and Regulations, Regulations Preamble January 1991-June 1996 ¶ 31,036 (Final Rule on Open Access and Stranded Costs; see 61 FR 21540, May 10, 1996), must, individually or jointly with other entities, file with the Commission, no later than January 15, 2001:
(1) A statement that it is participating in a transmission entity that has been so approved;
(2) A detailed explanation of the extent to which the transmission entity in which it participates has the characteristics and performs the functions of a Regional Transmission Organization specified in paragraphs (j) and (k) of this section and accommodates the open architecture conditions in paragraph (l) of this section; and
(3) To the extent the transmission entity in which the public utility participates does not meet all the requirements of a Regional Transmission Organization specified in paragraphs (j), (k), and (l) of this section,
(i) A proposal to participate in a Regional Transmission Organization that meets such requirements in accordance with paragraph (d) of this section,
(ii) A proposal to modify the existing transmission entity so that it conforms to the requirements of a Regional Transmission Organization, or
(iii) A filing containing the information specified in paragraph (g) of this section addressing any efforts, obstacles, and plans with respect to conformance with those requirements.
(i)Entities that become public utilities with transmission facilities. An entity that is not a public utility that owns, operates or controls facilities used for the transmission of electric energy in interstate commerce as of March 6, 2000, but later becomes such a public utility, must file a proposal to participate in a Regional Transmission Organization in accordance with paragraph (d) of this section, or an alternative filing in accordance with paragraph (g) of this section, by October 15, 2000 or 60 days prior to the date on which the public utility engages in any transmission of electric energy in interstate commerce, whichever comes later. If a proposal to participate in accordance with paragraph (d) of this section is filed, it must propose that operational control of the applicant's transmission system will be transferred to the Regional Transmission Organization within six months of filing the proposal.
(j)Required characteristics for a Regional Transmission Organization. A Regional Transmission Organization must satisfy the following characteristics when it commences operation:
(1)Independence. The Regional Transmission Organization must be independent of any market participant. The Regional Transmission Organization must include, as part of its demonstration of independence, a demonstration that it meets the following:
(i) The Regional Transmission Organization, its employees, and any non-stakeholder directors must not have financial interests in any market participant.
(ii) The Regional Transmission Organization must have a decision making process that is independent of control by any market participant or class of participants.
(iii) The Regional Transmission Organization must have exclusive and independent authority under section 205 of the Federal Power Act (16 U.S.C. 824d ), to propose rates, terms and conditions of transmission service provided over the facilities it operates.

Note to paragraph (j)(1)(iii): Transmission owners retain authority under section 205 of the Federal Power Act (16 U.S.C. 824d ) to seek recovery from the Regional Transmission Organization of the revenue requirements associated with the transmission facilities that they own.

(iv)
(A) The Regional Transmission Organization must provide:
(1) With respect to any Regional Transmission Organization in which market participants have an ownership interest, a compliance audit of the independence of the Regional Transmission Organization's decision making process under paragraph (j)(1)(ii) of this section, to be performed two years after approval of the Regional Transmission Organization, and every three years thereafter, unless otherwise provided by the Commission.
(2) With respect to any Regional Transmission Organization in which market participants have a role in the Regional Transmission Organization's decision making process but do not have an ownership interest, a compliance audit of the independence of the Regional Transmission Organization's decision making process under paragraph (j)(1)(ii) of this section, to be performed two years after its approval as a Regional Transmission Organization.
(B) The compliance audits under paragraph (j)(1)(iv)(A) of this section must be performed by auditors who are not affiliated with the Regional Transmission Organization or transmission facility owners that are members of the Regional Transmission Organization.
(2)Scope and regional configuration. The Regional Transmission Organization must serve an appropriate region. The region must be of sufficient scope and configuration to permit the Regional Transmission Organization to maintain reliability, effectively perform its required functions, and support efficient and non-discriminatory power markets.
(3)Operational authority. The Regional Transmission Organization must have operational authority for all transmission facilities under its control. The Regional Transmission Organization must include, as part of its demonstration of operational authority, a demonstration that it meets the following:
(i) If any operational functions are delegated to, or shared with, entities other than the Regional Transmission Organization, the Regional Transmission Organization must ensure that this sharing of operational authority will not adversely affect reliability or provide any market participant with an unfair competitive advantage. Within two years after initial operation as a Regional Transmission Organization, the Regional Transmission Organization must prepare a public report that assesses whether any division of operational authority hinders the Regional Transmission Organization in providing reliable, non-discriminatory and efficiently priced transmission service.
(ii) The Regional Transmission Organization must be the security coordinator for the facilities that it controls.
(4)Short-term reliability. The Regional Transmission Organization must have exclusive authority for maintaining the short-term reliability of the grid that it operates. The Regional Transmission Organization must include, as part of its demonstration with respect to reliability, a demonstration that it meets the following:
(i) The Regional Transmission Organization must have exclusive authority for receiving, confirming and implementing all interchange schedules.
(ii) The Regional Transmission Organization must have the right to order redispatch of any generator connected to transmission facilities it operates if necessary for the reliable operation of these facilities.
(iii) When the Regional Transmission Organization operates transmission facilities owned by other entities, the Regional Transmission Organization must have authority to approve or disapprove all requests for scheduled outages of transmission facilities to ensure that the outages can be accommodated within established reliability standards.
(iv) If the Regional Transmission Organization operates under reliability standards established by another entity (e.g., a regional reliability council), the Regional Transmission Organization must report to the Commission if these standards hinder it from providing reliable, non-discriminatory and efficiently priced transmission service.
(k)Required functions of a Regional Transmission Organization. The Regional Transmission Organization must perform the following functions. Unless otherwise noted, the Regional Transmission Organization must satisfy these obligations when it commences operations.
(1)Tariff administration and design. The Regional Transmission Organization must administer its own transmission tariff and employ a transmission pricing system that will promote efficient use and expansion of transmission and generation facilities. As part of its demonstration with respect to tariff administration and design, the Regional Transmission Organization must satisfy the standards listed in paragraphs (k)(1)(i) and (ii) of this section, or demonstrate that an alternative proposal is consistent with or superior to satisfying such standards.
(i) The Regional Transmission Organization must be the only provider of transmission service over the facilities under its control, and must be the sole administrator of its own Commission-approved open access transmission tariff. The Regional Transmission Organization must have the sole authority to receive, evaluate, and approve or deny all requests for transmission service. The Regional Transmission Organization must have the authority to review and approve requests for new interconnections.
(ii) Customers under the Regional Transmission Organization tariff must not be charged multiple access fees for the recovery of capital costs for transmission service over facilities that the Regional Transmission Organization controls.
(2)Congestion management. The Regional Transmission Organization must ensure the development and operation of market mechanisms to manage transmission congestion. As part of its demonstration with respect to congestion management, the Regional Transmission Organization must satisfy the standards listed in paragraph (k)(2)(i) of this section, or demonstrate that an alternative proposal is consistent with or superior to satisfying such standards.
(i) The market mechanisms must accommodate broad participation by all market participants, and must provide all transmission customers with efficient price signals that show the consequences of their transmission usage decisions. The Regional Transmission Organization must either operate such markets itself or ensure that the task is performed by another entity that is not affiliated with any market participant.
(ii) The Regional Transmission Organization must satisfy the market mechanism requirement no later than one year after it commences initial operation. However, it must have in place at the time of initial operation an effective protocol for managing congestion.
(3)Parallel path flow. The Regional Transmission Organization must develop and implement procedures to address parallel path flow issues within its region and with other regions. The Regional Transmission Organization must satisfy this requirement with respect to coordination with other regions no later than three years after it commences initial operation.
(4)Ancillary services. The Regional Transmission Organization must serve as a provider of last resort of all ancillary services required by Order No. 888, FERC Statutes and Regulations, Regulations Preamble January 1991-June 1996 ¶ 31,036 (Final Rule on Open Access and Stranded Costs; see 61 FR 21540, May 10, 1996), and subsequent orders. As part of its demonstration with respect to ancillary services, the Regional Transmission Organization must satisfy the standards listed in paragraphs (k)(4)(i) through (iii) of this section, or demonstrate that an alternative proposal is consistent with or superior to satisfying such standards.
(i) All market participants must have the option of self-supplying or acquiring ancillary services from third parties subject to any restrictions imposed by the Commission in Order No. 888, FERC Statutes and Regulations, Regulations Preamble January 1991-June 1996 ¶ 31,036 (Final Rule on Open Access and Stranded Costs), and subsequent orders.
(ii) The Regional Transmission Organization must have the authority to decide the minimum required amounts of each ancillary service and, if necessary, the locations at which these services must be provided. All ancillary service providers must be subject to direct or indirect operational control by the Regional Transmission Organization. The Regional Transmission Organization must promote the development of competitive markets for ancillary services whenever feasible.
(iii) The Regional Transmission Organization must ensure that its transmission customers have access to a real-time balancing market. The Regional Transmission Organization must either develop and operate this market itself or ensure that this task is performed by another entity that is not affiliated with any market participant.
(5)OASIS and Total Transmission Capability (TTC) and Available Transmission Capability (ATC). The Regional Transmission Organization must be the single OASIS site administrator for all transmission facilities under its control and independently calculate TTC and ATC.
(6)Market monitoring. To ensure that the Regional Transmission Organization provides reliable, efficient and not unduly discriminatory transmission service, the Regional Transmission Organization must provide for objective monitoring of markets it operates or administers to identify market design flaws, market power abuses and opportunities for efficiency improvements, and propose appropriate actions. As part of its demonstration with respect to market monitoring, the Regional Transmission Organization must satisfy the standards listed in paragraphs (k)(6)(i) through (k)(6)(iii) of this section, or demonstrate that an alternative proposal is consistent with or superior to satisfying such standards.
(i) Market monitoring must include monitoring the behavior of market participants in the region, including transmission owners other than the Regional Transmission Organization, if any, to determine if their actions hinder the Regional Transmission Organization in providing reliable, efficient and not unduly discriminatory transmission service.
(ii) With respect to markets the Regional Transmission Organization operates or administers, there must be a periodic assessment of how behavior in markets operated by others (e.g., bilateral power sales markets and power markets operated by unaffiliated power exchanges) affects Regional Transmission Organization operations and how Regional Transmission Organization operations affect the efficiency of power markets operated by others.
(iii) Reports on opportunities for efficiency improvement, market power abuses and market design flaws must be filed with the Commission and affected regulatory authorities.
(7)Planning and expansion. The Regional Transmission Organization must be responsible for planning, and for directing or arranging, necessary transmission expansions, additions, and upgrades that will enable it to provide efficient, reliable and non-discriminatory transmission service and coordinate such efforts with the appropriate state authorities. As part of its demonstration with respect to planning and expansion, the Regional Transmission Organization must satisfy the standards listed in paragraphs (k)(7)(i) and (ii) of this section, or demonstrate that an alternative proposal is consistent with or superior to satisfying such standards.
(i) The Regional Transmission Organization planning and expansion process must encourage market-driven operating and investment actions for preventing and relieving congestion.
(ii) The Regional Transmission Organization's planning and expansion process must accommodate efforts by state regulatory commissions to create multi-state agreements to review and approve new transmission facilities. The Regional Transmission Organization's planning and expansion process must be coordinated with programs of existing Regional Transmission Groups (See § 2.21 of this chapter) where appropriate.
(iii) If the Regional Transmission Organization is unable to satisfy this requirement when it commences operation, it must file with the Commission a plan with specified milestones that will ensure that it meets this requirement no later than three years after initial operation.
(8)Interregional coordination. The Regional Transmission Organization must ensure the integration of reliability practices within an interconnection and market interface practices among regions.
(l)Open architecture.
(1) Any proposal to participate in a Regional Transmission Organization must not contain any provision that would limit the capability of the Regional Transmission Organization to evolve in ways that would improve its efficiency, consistent with the requirements in paragraphs (j) and (k) of this section.
(2) Nothing in this regulation precludes an approved Regional Transmission Organization from seeking to evolve with respect to its organizational design, market design, geographic scope, ownership arrangements, or methods of operational control, or in other appropriate ways if the change is consistent with the requirements of this section. Any future filing seeking approval of such changes must demonstrate that the proposed changes will meet the requirements of paragraphs (j), (k) and (l) of this section.

18 C.F.R. §35.34

Order 2000-A, 65 FR 12110 , Mar. 8, 2000, as amended by Order 679, 71 FR 43338 , July 31, 2006