This part provides general information about the conduct of initial and routine inspections of declared facilities subject to inspection under CWC Verification Annex Part VI(E), Part VII(B), Part VIII(B) and Part IX(B). See part 717 of the CWCR for provisions concerning challenge inspections.
Note to § 716.1(b)(1) : All Schedule 1 facilities submitting a declaration are subject to inspection.
Note to § 716.1(b)(2) : The applicable inspection threshold for Schedule 2 plant sites is ten times higher than the applicable declaration threshold. Only declared plant sites, comprising at least one declared plant that exceeds the applicable inspection threshold, are subject to inspection.
Note to § 716.1(b)(3) : The methodology for determining a declarable and inspectable plant site is different. A Schedule 3 plant site that submits a declaration is subject to inspection only if the aggregate production of a Schedule 3 chemical at all declared plants on the plant site exceeds 200 metric tons.
Note 1 to § 716.1(b)(4) : You must include amounts of unscheduled discrete organic chemicals containing phosphorus, sulfur or fluorine in the calculation of your plant site's aggregate production of unscheduled discrete organic chemicals.
Note 2 to § 716.1(b)(4) : All UDOC plant sites that submit a declaration based on § 715.1(a)(1)(i) of the CWCR are subject to a routine inspection.
Note 3 to paragraph (b)(4): Any UDOC plant site that is eligible, in accordance with § 715.1(d)(2) of the CWCR, to submit a Change in Inspection Status Form or an Annual Declaration on Past Activities by December 15th of the current calendar year (i.e., a plant site that will be below the inspection threshold level indicated in paragraph (b)(4) of this section during the current calendar year), but that fails to do so, will remain subject to inspection through at least the 90-day period at the beginning of the next calendar year.
15 C.F.R. §716.1