14 C.F.R. § 121.321

Current through October 31, 2024
Section 121.321 - Operations in icing

After October 21, 2013, no person may operate an airplane with a certificated maximum takeoff weight less than 60,000 pounds in conditions conducive to airframe icing unless it complies with this section. As used in this section, the phrase "conditions conducive to airframe icing" means visible moisture at or below a static air temperature of 5 °C or a total air temperature of 10 °C, unless the approved Airplane Flight Manual provides another definition.

(a) When operating in conditions conducive to airframe icing, compliance must be shown with paragraph (a)(1), or (2), or (3) of this section.
(1) The airplane must be equipped with a certificated primary airframe ice detection system.
(i) The airframe ice protection system must be activated automatically, or manually by the flightcrew, when the primary ice detection system indicates activation is necessary.
(ii) When the airframe ice protection system is activated, any other procedures in the Airplane Flight Manual for operating in icing conditions must be initiated.
(2) Visual cues of the first sign of ice formation anywhere on the airplane and a certificated advisory airframe ice detection system must be provided.
(i) The airframe ice protection system must be activated when any of the visual cues are observed or when the advisory airframe ice detection system indicates activation is necessary, whichever occurs first.
(ii) When the airframe ice protection system is activated, any other procedures in the Airplane Flight Manual for operating in icing conditions must be initiated.
(3) If the airplane is not equipped to comply with the provisions of paragraph (a)(1) or (2) of this section, then the following apply:
(i) When operating in conditions conducive to airframe icing, the airframe ice protection system must be activated prior to, and operated during, the following phases of flight:
(A) Takeoff climb after second segment,
(B) En route climb,
(C) Go-around climb,
(D) Holding,
(E) Maneuvering for approach and landing, and
(F) Any other operation at approach or holding airspeeds.
(ii) During any other phase of flight, the airframe ice protection system must be activated and operated at the first sign of ice formation anywhere on the airplane, unless the Airplane Flight Manual specifies that the airframe ice protection system should not be used or provides other operational instructions.
(iii) Any additional procedures for operation in conditions conducive to icing specified in the Airplane Flight Manual or in the manual required by § 121.133 must be initiated.
(b) If the procedures specified in paragraph (a)(3)(i) of this section are specifically prohibited in the Airplane Flight Manual, compliance must be shown with the requirements of paragraph (a)(1) or (2) of this section.
(c) Procedures necessary for safe operation of the airframe ice protection system must be established and documented in:
(1) The Airplane Flight Manual for airplanes that comply with paragraph (a)(1) or (2) of this section, or
(2) The Airplane Flight Manual or in the manual required by § 121.133 for airplanes that comply with paragraph (a)(3) of this section.
(d) Procedures for operation of the airframe ice protection system must include initial activation, operation after initial activation, and deactivation. Procedures for operation after initial activation of the ice protection system must address-
(1) Continuous operation,
(2) Automatic cycling,
(3) Manual cycling if the airplane is equipped with an ice detection system that alerts the flightcrew each time the ice protection system must be cycled, or
(4) Manual cycling based on a time interval if the airplane type is not equipped with features necessary to implement (d)(1)-(3) of this section.
(e) System installations used to comply with paragraph (a)(1) or (a)(2) of this section must be approved through an amended or supplemental type certificate in accordance with part 21 of this chapter.

14 C.F.R. §121.321

Doc. No. FAA-2009-0675, 78 FR 15876 , Mar. 13, 2013