10 C.F.R. § C to Subpart D of Part 1021

Current through November 30, 2024
Appendix C to Subpart D of Part 1021 - Classes of Actions that Normally Require EAs but not Necessarily EISs

Table of Contents

C1 [Reserved]

C2 [Reserved]

C3 Electric Power Marketing Rate Changes, Not Within Normal Operating Limits

C4 Upgrading, Rebuilding, or Construction of Powerlines

C5 Vegetation Management Program

C6 Erosion Control Program

C7 Contracts, Policies, and Marketing and Allocation Plans for Electric Power

C8 Protection of Cultural Resources and Fish and Wildlife Habitat

C9 Wetlands Demonstration Projects

C10 [Reserved]

C11 Particle Acceleration Facilities

C12 Energy System Demonstration Actions

C13 [Reserved]

C14 Water Treatment Facilities

C15 Research and Development Incinerators and Nonhazardous Waste Incinerators

C16 Large Waste Packaging and Storage Facilities

C1 [Reserved]

C2 [Reserved]

C3 Electric Power Marketing Rate Changes, Not Within Normal Operating Limits

Rate changes for electric power, power transmission, and other products or services provided by Power Marketing Administrations that are based on changes in revenue requirements if the operations of generation projects would not remain within normal operating limits.

C4 Upgrading, Rebuilding, or Construction of Powerlines

(a) Upgrading or rebuilding existing powerlines when the action does not qualify for categorical exclusion B4.13; or construction of powerlines:

(1) More than approximately 10 miles in length outside previously disturbed or developed powerline or pipeline rights-of-way; or

(2) more than approximately 20 miles in length within previously disturbed or developed powerline or pipeline rights-of-way.

C5 Vegetation Management Program

Implementation of a Power Marketing Administration system-wide vegetation management program.

C6 Erosion Control Program

Implementation of a Power Marketing Administration system-wide erosion control program.

C7 Contracts, Policies, and Marketing and Allocation Plans for Electric Power

(a) Establishment and implementation of contracts, policies, and marketing and allocation plans related to electric power acquisition that involve:

(1) The interconnection of, or acquisition of power from, new generation resources that are equal to or less than 50 average megawatts, unless the generation resource is eligible for a categorical exclusion;

(2) Changes in the normal operating limits of generation resources equal to or less than 50 average megawatts; or

(3) Service to discrete new loads of less than 10 average megawatts over a 12-month period.

C8 Protection of Cultural Resources and Fish and Wildlife Habitat

Large-scale activities undertaken to protect cultural resources (such as fencing, labeling, and flagging) or to protect, restore, or improve fish and wildlife habitat, fish passage facilities (such as fish ladders and minor diversion channels), or fisheries.

C9 Wetlands Demonstration Projects

Field demonstration projects for wetlands mitigation, creation, and restoration.

C10 [Reserved]

C11 Particle Acceleration Facilities

Siting, construction or modification, operation, and decommissioning of low- or medium-energy (when the primary beam energy exceeds approximately 100 million electron volts and the average beam power exceeds approximately 250 kilowatts or where the average current exceeds 2.5 milliamperes) particle acceleration facilities, including electron beam acceleration facilities, and associated beamlines, storage rings, colliders, and detectors for research and medical purposes, within or contiguous to a previously disturbed or developed area (where active utilities and currently used roads are readily accessible).

C12 Energy System Demonstration Actions

Siting, construction, operation, and decommissioning of energy system demonstration actions (including, but not limited to, wind resource, hydropower, geothermal, fossil fuel, biomass, and solar energy, but excluding nuclear). For purposes of this category, "demonstration actions" means actions that are undertaken at a scale to show whether a technology would be viable on a larger scale and suitable for commercial deployment.

C13 [Reserved]

C14 Water Treatment Facilities

Siting, construction (or expansion), operation, and decommissioning of wastewater, surface water, potable water, and sewage treatment facilities with a total capacity greater than approximately 250,000 gallons per day, and of lower capacity wastewater and surface water treatment facilities whose liquid discharges are not subject to external regulation.

C15 Research and Development Incinerators and Nonhazardous Waste Incinerators

Siting, construction (or expansion), operation, and decommissioning of research and development incinerators for any type of waste and of any other incinerators that would treat nonhazardous solid waste (as designated in 40 CFR 261.4(b) ).

C16 Large Waste Packaging and Storage Facilities

Siting, construction, modification to increase capacity, operation, and decommissioning of packaging and unpacking facilities (such as characterization operations) and large storage facilities (greater than approximately 50,000 square feet in area) for waste, except high-level radioactive waste, generated onsite or resulting from activities connected to site operations. These actions do not include storage, packaging, or unpacking of spent nuclear fuel. (See also B6.4, B6.5, B6.6, and B6.10 of appendix B.)

10 C.F.R. §C to Subpart D of Part 1021

57 FR 15144, Apr. 24, 1992, 85 FR 78205 , Dec. 4, 2020
85 FR 78205 , 1/4/2021; 89 FR 34094 , 5/30/2024