When a document is required to be filed within a prescribed time, an extension of time to file may be granted by the OHA upon good cause shown.
10 C.F.R. §1003.5
When a document is required to be filed within a prescribed time, an extension of time to file may be granted by the OHA upon good cause shown.
10 C.F.R. §1003.5