F = 1/2 (A/B + C/D) (E); Where:
A = Contractor's allocated Capacity
B = Total California allocated Capacity
C = Contractor's allocated Firm Energy
D = Total California allocated Firm Energy
E = Third-priority Excess Energy available to California
F = Contractor's third-priority Excess Energy
10 C.F.R. §904.10