10 C.F.R. § 205.6

Current through November 30, 2024
Section 205.6 - Extension of time

When a document is required to be filed within a prescribed time, an extension of time to file may be granted by the office with which the document is required to be filed upon good cause shown.

10 C.F.R. § 205.6