10 C.F.R. § 75.29

Current through November 30, 2024
Section 75.29 - Requirements for facilities, locations, and nuclear material outside facilities after termination from IAEA safeguards
(a)Licensees of facilities. A licensee of a facility shall submit an Inventory Change Report pursuant to §§ 75.6(c) and 75.31(a) following notification from the NRC that IAEA safeguards have been terminated as described in § 75.28 .
(b)Licensees of locations. A licensee of a location shall provide annual updates pursuant to § 75.11(c) following notification from the NRC that IAEA safeguards have been terminated as described in § 75.28 .
(c)Possessors of nuclear material outside facilities. A possessor of nuclear material outside facilities shall submit an Inventory Change Report pursuant to §§ 75.6(e) and 75.31(b) following notification from the NRC that IAEA safeguards have been terminated as described in § 75.28 .
(d) Nuclear material that has had IAEA safeguards terminated as described in § 75.28 is not subject to inspections by the IAEA.

10 C.F.R. §75.29

83 FR 19612 , 6/4/2018