10 C.F.R. § 72.240

Current through October 31, 2024
Section 72.240 - Conditions for spent fuel storage cask renewal
(a) The certificate holder may apply for renewal of the design of a spent fuel storage cask for a term not to exceed 40 years. In the event that the certificate holder does not apply for a cask design renewal, any licensee using a spent fuel storage cask, a representative of such licensee, or another certificate holder may apply for a renewal of that cask design for a term not to exceed 40 years.
(b) The application for renewal of the design of a spent fuel storage cask must be submitted not less than 30 days before the expiration date of the CoC. When the applicant has submitted a timely application for renewal, the existing CoC will not expire until the application for renewal has been determined by the NRC.
(c) The application must be accompanied by a safety analysis report (SAR). The SAR must include the following:
(1) Design bases information as documented in the most recently updated final safety analysis report (FSAR) as required by § 72.248 ;
(2) Time-limited aging analyses that demonstrate that structures, systems, and components important to safety will continue to perform their intended function for the requested period of extended operation; and
(3) A description of the AMP for management of issues associated with aging that could adversely affect structures, systems, and components important to safety.
(d) The design of a spent fuel storage cask will be renewed if the conditions in subpart G of this part and § 72.238 are met, and the application includes a demonstration that the storage of spent fuel has not, in a significant manner, adversely affected structures, systems, and components important to safety.
(e) In approving the renewal of the design of a spent fuel storage cask, the NRC may revise the CoC to include terms, conditions, and specifications that will ensure the safe operation of the cask during the renewal term, including but not limited to, terms, conditions, and specifications that will require the implementation of an AMP.

10 C.F.R. §72.240

76 FR 8891 , Feb. 16, 2011