10 C.F.R. § 63.15

Current through November 30, 2024
Section 63.15 - Site characterization
(a) DOE shall conduct a program of site characterization with respect to the Yucca Mountain site before it submits an application for a license to be issued under this part.
(b) DOE shall conduct the investigations to obtain the required information in a manner that limits adverse effects on the long-term performance of the geologic repository at Yucca Mountain to the extent practical.

10 C.F.R. §63.15