Current through Register 2024 Notice Reg. No. 44, November 1, 2024
Section 6630 - Construction, Installation, and Maintenance(a) Oil well pumping machinery shall be designed, constructed, installed and maintained to conform to good engineering practices.(b) No maintenance work shall be performed on a pumping unit located on a well that is being steamed.(c) The pumping unit shall be equipped with a brake system capable of stopping and securing all movable parts with the power off. The brake control shall be accessible outside the guards for the moving parts.Cal. Code Regs. Tit. 8, § 6630
1. Amendment filed 7-20-59; effective thirtieth day thereafter (Register 59, No. 12).
2. Amendment of subsections (a)-(b), new subsection (c) and amendment of NOTE filed 5-8-95; operative 6-7-95 (Register 95, No. 19). Note: Authority cited: Section 142.3, Labor Code. Reference: Section 142.3, Labor Code.
1. Amendment filed 7-20-59; effective thirtieth day thereafter (Register 59, No. 12).
2. Amendment of subsections (a)-(b), new subsection (c) and amendment of Note filed 5-8-95; operative 6-7-95 (Register 95, No. 19).