NOTE: See definition of "permit required activity" below.
Billboards.
Bridges.
Buildings.
Chimneys.
Dams.
Elevated highways.
Falsework.
Outdoor signs.
Powerhouses.
Scaffolding.
Silos.
Smokestacks.
Tanks or tank towers.
Transmission or communication towers.
NOTE: See Sections 341.1(f) and 341.1(g) of this article for additional details regarding the scope of coverage of a Project Permit.
NOTE NO. 1: See Section 341.1 of this article for additional details on Project Permit requirements for fixed tower cranes.
NOTE NO. 2: See Sections 344.70 et seq. of Title 8 of the California Code of Regulations for additional requirements applicable to permits to operate a fixed tower crane.
NOTE: No permit is required for work limited to the erection or placement of reinforcing bars used in reinforced concrete construction.
NOTE: No permit is required for work limited to the installation of interior partitions.
NOTE: For purposes of this subsection, "descend" means to enter any part of the trench or excavation once the excavation has attained a depth of 5 feet or more.
NOTE: The construction of motion picture, television, or theater stages and sets does not require a permit unless the conditions specified in Section 6500(b) of the California Labor Code have occurred. For purposes of this requirement, stages and sets include, without limitation, scenery, props, backdrops, flats, greenbeds, and grids.
Cal. Code Regs. Tit. 8, § 341
2. Certificate of Compliance filed 10-25-74 (Register 74, No. 43).
3. Amendment filed 7-9-80; effective thirtieth day thereafter (Register 80, No. 28).
4. Amendment of subsection (a) filed 12-5-84; effective thirtieth day thereafter (Register 84, No. 49).
5. Amendment of subsection (a) filed 12-5-85; effective thirtieth day thereafter (Register 85, No. 49).
6. New subsection (a)(4) filed 3-18-91; operative 3-18-91 (Register 91, No. 15).
7. Repealer and new section filed 9-29-2006; operative 10-29-2006 (Register 2006, No. 39).
Note: Authority cited and Reference: Sections 60.5, 6308 and 6501, Labor Code. Reference: Sections 6500, 6501 and 6508, Labor Code.
2. Certificate of Compliance filed 10-25-74 (Register 74, No. 43).
3. Amendment filed 7-9-80; effective thirtieth day thereafter (Register 80, No. 28).
4. Amendment of subsection (a) filed 12-5-84; effective thirtieth day thereafter (Register 84, No. 49).
5. Amendment of subsection (a) filed 12-5-85; effective thirtieth day thereafter (Register 85, No. 49).
6. New subsection (a)(4) filed 3-18-91; operative 3-18-91 (Register 91, No. 15).
7. Repealer and new section filed 9-29-2006; operative 10-29-2006 (Register 2006, No. 39).