The Sponsor shall establish a replacement reserve to repair or replace failed or damaged capital items and to cover extraordinary maintenance expenses, as approved by the Department. Extraordinary maintenance expenses are expenses for infrequent major repairs and replacements of building components too costly to be absorbed by the Project's annual operating budget. In no event shall this reserve be used to fund limited partner exit costs.
(a) Withdrawals from the replacement reserve shall require prior written approval of the Department. Should the Department fail to take action on a request for an eligible withdrawal from the replacement reserve within 30 days of documented receipt of the request, that request shall be deemed approved.(b) The replacement reserve shall be funded from Operating Income, development sources or a combination of Operating Income and development sources.(1) For new construction or conversion Projects, the initial amount of annual deposits to the replacement reserve account shall be equal to at least the lesser of 0.6% of estimated construction costs associated with structures in the Project, excluding construction contingency and general contractor profit, overhead and general requirements, or $500 per unit. However, the Department may approve a different amount based on the results of a third-party reserve analysis, which it may require, or other reliable indicators of the need for replacement reserve funds over the initial 20 years of operation, or, in the case of transactions involving restructuring of existing Department loans, 20 years of operations after the restructuring.(2) For rehabilitation Projects, the initial amount of annual deposits to the replacement reserve account shall be determined by the Department based on the results of a third-party physical needs assessment or other reliable indicators of the need for replacement reserve funds over the initial 20 years of operation. In its initial underwriting, in the absence of an approved physical needs assessment or other reliable indicators of the need for replacement reserve funds, the Department may assume that the initial amount of annual deposits shall be $500 per unit.(3) The Department may periodically adjust the amount of required deposits to the replacement reserve for a particular Project based on the results of reserve analysis or other reliable indicators of the need for replacement reserve funds over time.(4) The Department may agree with other financing sources to allocate authority regarding amounts deposited into or withdrawn from the replacement reserve, where the Department determines that such arrangement would not jeopardize the fiscal integrity of the Project and the minimum reserve requirements would be maintained. For Projects subject to direct federal loan or grant programs, including Native American Housing Assistance and Self Determination Act programs, or receiving a permanent loan from CalHFA, the Department may also defer to the replacement reserve requirements of these agencies during the time such projects are regulated by a federal agency or CalHFA.(5) If the Department requires a reserve analysis because the Department determines the reserve is inadequate due to annual replacement costs exceeding or being reasonably likely to exceed the amounts deposited to the reserve, or due to a request by the Sponsor to adjust the required reserve amount, the analysis must result in a due diligence report that examines the current physical conditions at property(ies), specifies repairs or replacements needed immediately, and budgets for the long-term capital repair and replacement needs during the life of an asset, such as the results of using the Capital Needs Assessment eTool, developed by the U.S. Department of Housing and Urban Development.Cal. Code Regs. Tit. 25, § 8309
1. New section filed 9-29-2003; operative 9-29-2003 pursuant to Government Code section 11343.4 (Register 2003, No. 40).
2. Amendment of section and NOTE filed 11-8-2017; operative 11-15-2017 pursuant to Government Code section 11343.4(b)(3) (Register 2017, No. 45).
3. Governor Newsom issued Executive Order N-66-20 (2019 CA EO 66-20), dated May 29, 2020, relating to accommodations from the Department of Housing and Community Development for projects adversely affected by the COVID-19 pandemic. Note: Authority cited: Sections 50406(n), 50517.5(a)(1), 50517.5(a)(3), 50675.1(d), 50675.11, 50896.1(a) and 50896.3(b), Health and Safety Code. Reference: Sections 50517.5(d)(1), 50675.5(b)(8) and 50896.1(a), Health and Safety Code.
1. New section filed 9-29-2003; operative 9-29-2003 pursuant to Government Code section 11343.4(Register 2003, No. 40).
2. Amendment of section and Note filed 11-8-2017; operative 11/15/2017 pursuant to Government Code section 11343.4(b)(3) (Register 2017, No. 45).