Current through Register 2024 Notice Reg. No. 50, December 13, 2024
Section 1020.3 - Application Requirements for Permits for Accessory Buildings and Structures and Building Components(a) A person required to obtain a permit to install an accessory building or structure or building component, shall submit an application for the permit to construct to the enforcement agency, on a form prescribed by that agency.(b) The application for the permit to construct shall be accompanied by fees as specified in section 1020.7 of this article, or section 1020.4 when using plans with a standard plan approval.(c) A person submitting an application for a permit to construct an accessory building or structure or install a building component shall, in addition to the requirements of section 1034 of this chapter, submit three (3) copies of a plot plan for the lot where the accessory building or structure or building component is to be constructed. The plot plan shall be on the form prescribed by the department, indicating the planned location of the accessory building or structure or building component on the lot and indicate dimensions of and setbacks from the lot lines and other units or structures on adjacent lots. At least one (1) copy of the plot plan shall bear the original signature of the park owner or his or her designated representative.(d) When any person files applications simultaneously to construct or install two (2) or more accessory buildings or structures or building components which are identical, and are within the same park, only one (1) plan check fee shall be required.(e) If an application for a permit to construct is not complete or does not conform to the requirements of this chapter, the enforcement agency shall notify the applicant in writing within ten (10) working days of receipt of the application, as to the why the application does not comply.(f) A single permit may be issued for all accessory buildings or structures or building components to be erected or installed concurrently on the same lot including electrical, mechanical, and plumbing installations for each accessory building or structure or building component. If the applicant requests individual permits, they may be obtained for structural, electrical, mechanical, and plumbing installations, and are subject to separate individual fees.Cal. Code Regs. Tit. 25, § 1020.3
1. New section filed 7-6-2004; operative 7-6-2004 pursuant to Government Code section 11343.4 (Register 2004, No. 28). Note: Authority cited: Section 18300, Health and Safety Code. Reference: 18300, 18500, 18502.5 and 18552 Health and Safety Code.
1. New section filed 7-6-2004; operative 7-6-2004 pursuant to Government Code section 11343.4 (Register 2004, No. 28).