It shall be the duty of the applicant to notify the enforcement agency that the construction is ready for inspection and to provide access to the premises. Inspections shall be requested by the applicant at least (48) hours in advance of the intended inspection. It shall be the duty of the enforcement agency to notify or inform the applicant of the day during which the inspection is to be conducted.
Cal. Code Regs. Tit. 25, § 114
Note: Authority cited: Sections 17003.5, 17921, 50061.5 and 50559, Health and Safety Code. Reference: Section 17970, Health and Safety Code.