Current through Register 2024 Notice Reg. No. 50, December 13, 2024
Section 3719.6 - Application for Additional Contract Operator Credential(a) Within 30 days after entering into a contract to operate a wastewater treatment plant not included in the original application, a contract operator shall submit an application to the Office of Operator Certification requesting an additional contract operator credential. The application shall include the following: (1) the contract operator's name, mailing and business addresses, telephone number, and registration number;(2) the name, address, telephone number, and registration number of the owner of the wastewater treatment plant;(3) the name, address, telephone number, and chief plant operator of the wastewater treatment plant, the Regional Water Board overseeing the wastewater treatment plant, and the duration of the contract;(4) the name and grade level of each wastewater treatment plant operator employed at the wastewater treatment plant;(5) the original signature of the person authorized by the contract operator to enter the contract; and(6) the fee for issuing a new contract operator credential as prescribed in section 3719.16.(b) Within 30 days of receipt of an application for an additional contract operator credential, the Office of Operator Certification shall issue a contract operator credential in accordance with section 3719.3.Cal. Code Regs. Tit. 23, § 3719.6
1. New section filed 1-28-2013; operative 4-1-2013 (Register 2013, No. 5). Note: Authority cited: Sections 1058 and 13627.3, Water Code. Reference: Section 13627.3, Water Code.
1. New section filed 1-28-2013; operative 4-1-2013 (Register 2013, No. 5).