The entire pumpout system shall be inspected by the operator at regular intervals not exceeding six months and any worn components replaced. The Regional Board staff shall inspect the facility at regular intervals not to exceed one yea.
Cal. Code Regs. Tit. 23, § 2829
Note: Authority cited: Sections 775, 776, 777 and 778, Harbors and Navigation Code. Reference: Sections 775, 776, 777 and 778, Harbors and Navigation Code.