Section 841 - Time for Completion

In determining the period of time to be allowed to build diversion works and apply the water to full beneficial use, the particular conditions surrounding each case will govern. In every case the matter must be pressed with due diligence considering the size of the project and the obstacles to be overcome.

Cal. Code Regs. Tit. 23, § 841

1. Renumbering and amendment of Section 777 to Section 841 filed 1-16-87; effective thirtieth day thereafter (Register 87, No. 10). For prior history, see Register 60, No. 5.

Note: Authority cited: Section 1058, Water Code. Reference: Sections 1250, 1252 and 1260, Water Code.