Current through Register 2024 Notice Reg. No. 49, December 6, 2024
Section 2646 - When a Safety Orientation is Required(a) New Permits: After a new Permit is issued, but before work can begin, a documented safety orientation must occur.(b) Change of leader during a Permit period: If a new group leader, alternate group leader, or contractor's crew leader is designated during the Permit period, the new leader must be given a safety orientation by a maintenance supervisor, not by the previous leader.(c) Change of leader at the beginning of a successive Permit period: A safety orientation is not required if the safety orientation form on file from the previous Permit is signed by the same group leaders or contractor's crew leader designated for the new Permit period. However, if either group leader or crew leader is new, a new safety orientation is required.(d) After construction resulting in a Permit's suspension: If conditions at the site have changed, a new safety orientation is required before the Permit's suspension is lifted.(e) At the request of a maintenance supervisor: The maintenance supervisor may request a corrective safety orientation at any time during the Permit period if a volunteer adopter or contractor is found to be in violation of Permit provisions.Cal. Code Regs. Tit. 21, § 2646
1. New section filed 1-21-2010; operative 1-21-2010 pursuant to Government Code section 11343.4 (Register 2010, No. 4). Note: Authority cited: Section 91.5, Streets and Highways Code. Reference: Sections 91.5 and 92, Streets and Highways Code.
1. New section filed 1-21-2010; operative 1-21-2010 pursuant to Government Code section 11343.4 (Register 2010, No. 4).