Cal. Code Regs. tit. 20 § 2900

Current through Register 2024 Notice Reg. No. 44, November 1, 2024
Section 2900 - Scope

This Article applies to covered procurements entered into by local publicly owned electric utilities. The greenhouse gases emission performance standard established in section 2902(a) applies to any baseload generation, regardless of capacity, supplied under a covered procurement. The provisions requiring local publicly owned electric utilities to report covered procurements, including Sections 2908, 2909, and 2910, apply only to covered procurements involving powerplants 10MW and larger.

Cal. Code Regs. Tit. 20, § 2900

1. New chapter 11 (article 1, sections 2900-2913), article 1 (sections 2900-2913) and section filed 10-16-2007; operative 10-16-2007 pursuant to Government Code section 11343.4 (Register 2007, No. 42).

Note: Authority cited: Sections 25213 and 25218(e), Public Resources Code; and Section 8341, Public Utilities Code. Reference: Sections 8340 and 8341, Public Utilities Code.

1. New chapter 11 (article 1, sections 2900-2913), article 1 (sections 2900-2913) and section filed 10-16-2007; operative 10-16-2007 pursuant to Government Code section 11343.4 (Register 2007, No. 42).