Cal. Code Regs. tit. 20 § 43

Current through Register 2025 Notice Reg. No. 2, January 10, 2025
Section 43 - (Rule 43) Petitions for Modification or for Extension of Time or Effective Date. [Repealed]

Cal. Code Regs. Tit. 20, § 43

1. Amendment filed 10-10-75; designated effective 9-30-75 by Resolution A-4419. See Section 11445, Gov. Code (Register 75, No. 41).
2. Change without regulatory effect filed 6-2-88; operative 6-2-88 (Register 88, No. 24).
3. Repealer filed 10-19-98; designated effective 1-1-98 by Decision 97-12-043. Submitted to OAL for printing only (Register 98, No. 43).

Note: Authority cited: Section 1701, Public Utilities Code; and Section 2, Article XII, California Constitution. Reference: Section 1701, Public Utilities Code.

1. Amendment filed 10-10-75; designated effective 9-30-75 by Resolution A-4419. See Section 11445, Gov. Code (Register 75, No. 41).
2. Change without regulatory effect filed 6-2-88; operative 6-2-88 (Register 88, No. 24).
3. Repealer filed 10-19-98; designated effective 1-1-98 by Decision 97-12-043. Submitted to OAL for printing only (Register 98, No. 43).