Any proposed change in, or addition to, pipe line systems or any proposed installation or removal of equipment which can result in a different routing of production to or from the gauge tanks shall be reported to the state inspector giving the reason for such proposed change, addition, installation or removal at least 24 hours prior thereto. Plats and drawings showing the change shall be furnished to the Division of State Lands upon request.
Cal. Code Regs. Tit. 2, § 2102