Cal. Code Regs. tit. 19 § 1918.83

Current through Register 2024 Notice Reg. No. 50, December 13, 2024
Section 1918.83 - Structural Integrity
(a) Wind Loads. The completely assembled vapor processing unit shall be subjected to a wind loading velocity of not less than 60 MPH for a period of not less than 10 minutes. At the conclusion of this test there shall be no evidence of damage to the unit or its function.
(b) Dead Load Test. All portions of the assembled vapor processing unit, which may be stepped upon, shall be subjected to a dead load test of not less than 200 pounds. At the conclusion of such loading there shall be no evidence of damage to the unit, platform, structural frame or plumbing or their function.

Cal. Code Regs. Tit. 19, § 1918.83

1. New NOTE filed 9-27-85; effective thirtieth day thereafter (Register 85, No. 41).

Note: Authority cited: Section 41956, Health and Safety Code. Reference: Sections 41956 and 41958, Health and Safety Code.

1. New NOTE filed 9-27-85; effective thirtieth day thereafter (Register 85, No. 41).