Cal. Code Regs. tit. 17 § 94153

Current through Register 2024 Notice Reg. No. 36, September 6, 2024
Section 94153 - Test Method for Determining the Dynamic Pressure Performance of Phase II Vapor Recovery Systems of Dispensing Facilities

The test method for determining the dynamic pressure performance of Phase II vapor recovery systems of dispensing facilities is set forth in the Air Resources Board's TP-201.4 "Dynamic Back Pressure" which is incorporated herein by reference. (Adopted: April 12, 1996, as last amended July 3, 2002)

Cal. Code Regs. Tit. 17, § 94153

1. New section filed 6-11-96; operative 7-11-96 (Register 96, No. 24).
2. Amendment filed 6-12-2000; operative 7-12-2000 (Register 2000, No. 24).
3. Amendment filed 8-19-2002; operative 9-18-2002 (Register 2002, No. 34).

Note: Authority cited: Sections 39600, 39601, 39607 and 41954, Health and Safety Code. Reference: Sections 39515, 39516, 39605, 40001 and 41954, Health and Safety Code.

1. New section filed 6-11-96; operative 7-11-96 (Register 96, No. 24).
2. Amendment filed 6-12-2000; operative 7-12-2000 (Register 2000, No. 24).
3. Amendment filed 8-19-2002; operative 9-18-2002 (Register 2002, No. 34).