Section 1663.8 - Contracting in Phases

Should the Director determine that it is necessary or desirable to have a given project performed in phases, it will not be necessary to negotiate the total contract price in the initial instance, provided that the Director shall have determined that the firm is best qualified to perform the whole project at reasonable cost, and the contract contains provisions that the State, at its option, may utilize the firm for other phases and that the firm will accept a fair and reasonable price for subsequent phases to be later negotiated, mutually agreed upon and reflected in a subsequent written instrument, the procedure with regard to estimates and negotiation shall otherwise be applicable.

Cal. Code Regs. Tit. 14, § 1663.8

1. New section filed 6-9-94; operative 6-9-94 (Register 94, No. 23).

Note: Authority cited: Section 4526, Government Code. Reference: Sections 4526 and 4527, Government Code.

1. New section filed 6-9-94; operative 6-9-94 (Register 94, No. 23).