Cal. Code Regs. tit. 13 § 2269

Current through Register 2024 Notice Reg. No. 44, November 1, 2024
Section 2269 - Submittal of Compliance Plans
(a) Each producer shall, by September 1, 2000, submit to the executive officer a plan showing the producer's schedule for achieving compliance with the CaRFG Phase 3 standards set forth in this subarticle. Each producer shall, by September 1, 2001, September 1, 2002, and September 1, 2003 submit an update of the plan. Each compliance plan and update shall include the projected sequence and dates of all key events pertaining to planning, financing, and construction of necessary refinery modifications.

Cal. Code Regs. Tit. 13, § 2269

1. New section filed 11-16-92; operative 12-16-92 (Register 92, No. 47).
2. Amendment of section and NOTE filed 8-3-2000; operative 9-2-2000 (Register 2000, No. 31).
3. Amendment filed 12-24-2002; operative 12-24-2002 pursuant to Goverment Code section 11343.4 (Register 2002, No. 52).

Note: Authority cited: Sections 39600, 39601, 43013, 43013.1, 43018 and 43101, Health and Safety Code; and Western Oil and Gas Ass'n. v. Orange County Air Pollution Control District, 14 Cal.3d 411, 121 Cal. Rptr. 249 (1975). Reference: Sections 39000, 39001, 39002, 39003, 39010, 39500, 39515, 39516, 41511, 43000, 43013.1, 43016, 43018 and 43101, Health and Safety Code; and Western Oil and Gas Ass'n. v. Orange County Air Pollution Control District, 14 Cal.3d 411, 121 Cal. Rptr. 249 (1975).

1. New section filed 11-16-92; operative 12-16-92 (Register 92, No. 47).
2. Amendment of section and Note filed 8-3-2000; operative 9-2-2000 (Register 2000, No. 31).
3. Amendment filed 12-24-2002; operative 12-24-2002 pursuant to Goverment Code section 11343.4 (Register 2002, No. 52).