To renew a marijuana testing facility license, an applicant shall submit to the Department, at least 30 calendar days before the expiration date of the current marijuana testing facility license, but no more than 90 days before the expiration date of the current marijuana testing facility license, the following:
1. An application in a Department-provided format that includes: a. The legal name of the marijuana testing facility;b. The marijuana testing facility license number;c. The name of each owner;d. The name of the technical laboratory director designated according to R9-18-405(3);e. Whether the marijuana testing facility agrees to allow the Department to submit supplemental requests for information;f. An attestation that the information provided to the Department to renew the marijuana testing facility license is true and correct; andg. The signatures of the owner of the marijuana testing facility, according to R9-18-401(A), and the technical laboratory director and the date each signed;2. For each current parameter and analyte, documentation of current accreditation;3. If a change has been made to the standard operating procedure for a current parameter, a copy of the revised standard operating procedure;4. If a change has been made in the quality assurance plan, required in R9-18-409(B), for a current parameter, a copy of the revised quality assurance plan; and5. The fee in R9-18-102 for applying to renew a marijuana testing facility license.Ariz. Admin. Code § R9-18-404
Adopted by exempt rulemaking at 27 A.A.R. 696, effective 5/1/2021.