Ariz. Admin. Code § 4-34-801

Current through Register Vol. 30, No. 45, November 8, 2024
Section R4-34-801 - Permits
A. A properly licensed entity or person shall obtain a permit for the installation of a manufactured home, mobile home, FBB, or attached accessory structure, or rehabilitation of a mobile home.
B. The Department shall issue or deny a permit within seven business days after the application is received. If a permit is denied, corrections to the application shall be submitted to the Department within 20 business days after the denial.
C. A properly licensed entity or person shall obtain all required permits, such as zoning, flood plain, and installation, from the Department or local jurisdiction before beginning any site work except the assessment required under R4-34-802(E). All permits shall be posted in a conspicuous location onsite. The properly licensed entity or person who contracts to perform the installation and a licensed installer who subcontracts to perform the installation shall verify that all required permits have been obtained from the Department and local jurisdiction before beginning the installation.
D. A local jurisdiction that has entered into agreement with the Department may issue installation permits and conduct inspections.
E. The Department or a local jurisdiction participating in the installation inspection program shall charge the permit fee expressly authorized under A.R.S. § 41-4010(A)(4). The fee charged by the local jurisdiction shall not exceed the amount established by the Board.
F. Every permit, except a special-use permit, expires six months after the permit is issued. The Department may extend the permit for good cause if a written request is made to the Department before the permit expires and the fee established by the Board under A.R.S. § 41-4010(A)(4) is paid again.
G. A licensee or consumer shall obtain a certificate of occupancy from the Department before occupying a manufactured home, mobile home, or FBB.
H. The permit holder, owner, contractor, or designated responsible party identified on the permit shall request all required inspections.
I. At the time of a scheduled inspection, the permit holder, owner, contractor, or designated responsible party identified on the permit shall ensure all work to be inspected is accessible (opened) and no work is performed beyond the point indicated for each successive inspection without first obtaining approval from the Department.
J. The permit holder, owner, contractor, or designated responsible party identified on the permit shall ensure approved plans and all applicable manuals are available onsite.
K. A special-use permit for an FBB used for an event of 45 days or less shall be obtained from the Department. The special-use permit expires 45 days from the date of issuance. The holder of a special-use permit shall remove the FBB from the site when the permit expires.

Ariz. Admin. Code § R4-34-801

Adopted effective January 31, 1979 (Supp. 79-1). Amended effective October 20, 1981 (Supp. 81-5). Former Section R4-34-801 repealed, new Section R4-34-801 renumbered from R4-34-501 and amended effective July 3, 1991 (Supp. 91-1). Section repealed by final rulemaking at 6 A.A.R. 47, effective December 8, 1999; new Section adopted by final rulemaking at 6 A.A.R. 145, effective December 8, 1999 (Supp. 99-4). Amended by final rulemaking at 18 A.A.R. 944, effective June 4, 2012 (Supp. 12-2). Amended by final rulemaking at 24 A.A.R. 1499, effective 6/30/2018. Amended by final rulemaking at 26 A.A.R. 1509, effective 9/6/2020.