Ariz. Admin. Code § 4-34-706

Current through Register Vol. 30, No. 50, December 13, 2024
Section R4-34-706 - FBB Installation

A properly licensed entity or person shall include the following in installation plans submitted to the Department:

1. A site plan that includes the location of the building and all utility lines;
2. A foundation plan that includes:
a. A description of the soil class and the soil bearing pressure;
b. A description of footings and other foundation supports designed to meet the minimum bearing pressure at the depth required;
c. A complete set of drawings indicating dimensions and details of the foundation footing and anchoring; and a complete list of materials with a cross-identification of how materials will be used, in the appropriate view; and
d. Calculations, prepared by an Arizona registered engineer, for all load conditions including wind loads for horizontal loads, uplift loads, and overturning; and horizontal and torsional earthquake effects on foundations.
3. Electrical drawings, including the isometric one-line diagram required by R4-34-102, that contain the following information:
a. Size and type of conductors, length of feeders, and all amperage;
b. Dimensions of gutterways and raceways;
c. Complete details of panelboards, switchboards, and distribution centers; and
d. All grounding and bonding connections.
4. Plumbing drawings, including one-line diagrams required by R4-34-102 that contain the following information:
a. Location of sewer tap, water meter, and gas meter;
b. Size, length, and all materials for sewer, water, and gas lines;
c. Location of all cleanouts and grade of sewer line; and
d. Fixture unit calculations for plumbing and gas fixtures.

5. Fastening and closure details for connection of multiple modules or panels.
6. Dimensional plans and details for all components and construction to be field installed.

Ariz. Admin. Code § R4-34-706

New Section adopted by final rulemaking at 6 A.A.R. 145, effective December 8, 1999 (Supp. 99-4). Amended by final rulemaking at 14 A.A.R. 286, effective March 8, 2008 (Supp. 08-1). Amended by final rulemaking at 18 A.A.R. 944, effective June 4, 2012 (Supp. 12-2). Amended by final rulemaking at 24 A.A.R. 1499, effective 6/30/2018. Amended by final rulemaking at 26 A.A.R. 1509, effective 9/6/2020.