Current through Register Vol. 30, No. 49, December 6, 2024
A. A manufacturer shall construct an FBB according to the applicable standards in R4-34-102 and: 1. Provide a complete set of drawings and specifications to the Department under R4-34-703(B);2. Affix a permanent serial or identification number to each module or panel during the first stage of manufacturing. If an FBB has multiple sections, the manufacturer shall ensure each module or panel is separately identified. The serial or identification number location and application method shall be shown in the plans required under R4-34-703; and3. Affix a Modular Manufacturer's Certificate to each completed module of each modular building where indicated in the plan required under R4-34-703(B)(5). A Modular Manufacturer's Certificate is not required for a panelized building. B. The Department may require a manufacturer of an FBB that is produced and shipped before plan approval to remove the FBB from this state and remove the Modular Manufacturer's Certificate based on the Department's assessment of the following factors: 1. Probable harm to public safety and welfare,2. Previous violations of a similar nature, and3. Manufacturer's failure to comply with plan submittal and requirements.Ariz. Admin. Code § R4-34-603
Adopted effective January 31, 1979 (Supp. 79-1). Amended effective July 3, 1991 (Supp. 91-3). Section repealed by final rulemaking at 6 A.A.R. 47, effective December 8, 1999; new Section adopted by final rulemaking at 6 A.A.R. 145, effective December 8, 1999 (Supp. 99-4). Amended by final rulemaking at 14 A.A.R. 286, effective March 8, 2008 (Supp. 08-1). Amended by final rulemaking at 18 A.A.R. 944, effective June 4, 2012 (Supp. 12-2). Amended by final rulemaking at 24 A.A.R. 1499, effective 6/30/2018. Amended by final rulemaking at 26 A.A.R. 1509, effective 9/6/2020.