Current through Register Vol. 30, No. 50, December 13, 2024
Section R18-9-D636 - Establishing Permit ConditionsA. In addition to conditions required in R18-9-D635, the Director shall establish conditions, as required on a case-by-case basis under R18-9-C628 (Permit Duration), R18-9-D637 (Schedules of Compliance), and R18-9-D638 (Requirements for Recording and Reporting Monitoring Results). Permits for owners or operators of Class VI injection wells shall include conditions meeting the requirements of Part J of this Article. Permits for other wells shall contain the following requirements, when applicable. 1. Construction requirements as set forth in this Article. Existing wells shall achieve compliance with such requirements according to a compliance schedule established as a permit condition. The owner or operator of a proposed new injection well shall submit plans for testing, drilling, and construction as part of the permit application. Except as authorized by an area permit, no construction may commence until a permit has been issued containing construction requirements. New wells shall be in compliance with these requirements prior to commencing injection operations. Changes in construction plans during construction may be approved by the Director as minor modifications as defined under R18-9-C633. No such changes may be physically incorporated into construction of the well prior to approval of the modification by the Director.2. Corrective action as set forth in R18-9-D639 and R18-9-J659.3. Operation requirements as set forth in this Article; the permit shall establish any maximum injection volumes and/or pressures necessary to assure that fractures are not initiated in the confining zone, that injected fluids do not migrate into any USDW, that formation fluids are not displaced into any USDW, and to assure compliance with the operating requirements under this Article.4. Monitoring and reporting requirements as set forth in this Article. The permittee shall be required to identify types of tests and methods used to generate the monitoring data. Monitoring of the nature of injected fluids shall comply with an analytical method prescribed in A.A.C. R9-14-610, or an alternative analytical method approved under A.A.C. R9-14-610(C), or as approved by the Director. A test result from a sample taken to determine compliance with a national primary drinking water standard is valid only if the sample is analyzed by a laboratory that is licensed by the Arizona Department of Health Services, an out-of-state laboratory licensed under A.R.S. § 36-495.14, or a laboratory exempted under A.R.S. § 36-495.02, for the analysis performed.5. After a cessation of operations for two years the owner or operator shall plug and abandon the well in accordance with the plan unless they: a. Provide notice to the Director; andb. Describe actions or procedures, satisfactory to the Director, that the owner or operator will take to ensure that the well will not endanger USDWs during the period of temporary abandonment. These actions and procedures shall include compliance with the technical requirements applicable to active injection wells unless waived by the Director.6. Financial responsibility. a. The permittee, including the transferor of a permit, is required to demonstrate and maintain financial responsibility and resources to close, plug, and abandon the underground injection operation in a manner prescribed by the Director until: i. The well has been plugged and abandoned in accordance with an approved plugging and abandonment plan pursuant to R18-9-D635(15), R18-9-B614, and R18-9-J667, and submitted a plugging and abandonment report pursuant to R18-9-D635(16); orii. The well has been converted in compliance with the requirements of R18-9-D635(14); oriii. The transferor of a permit has received notice from the Director that the owner or operator receiving transfer of the permit, the new permittee, has demonstrated financial responsibility for the well.b. The permittee shall show evidence of such financial responsibility to the Director by the submission of a surety bond, or other adequate assurance, such as a financial statement or other materials acceptable to the Director. For Class VI wells, the permittee shall show evidence of such financial responsibility to the Director by the submission of a qualifying instrument, such as a financial statement or other materials acceptable to the Director. The owner or operator of a Class VI well must comply with the financial responsibility requirements set forth in R18-9-J660.7. A permit for any Class I, II, III or VI well or injection project that lacks mechanical integrity shall include, and for any Class V well may include, a condition prohibiting injection operations until the permittee shows to the satisfaction of the Director under R18-9-B613 or R18-9-J664 of this Chapter for Class VI, that the well has mechanical integrity.8. The Director shall impose on a case-by-case basis such additional conditions as are necessary to prevent the migration of fluids into USDWs.B. In addition to conditions required in all permits, the Director shall establish conditions in permits as required on a case-by-case basis, to provide for and assure compliance with all applicable requirements of this Article. Applicable requirements include, but are not limited to:1. State statutory or regulatory requirements in effect prior to final administrative disposition of a permit; or2. Any requirement in effect prior to the modification or revocation and reissuance of a permit, to the extent allowed under R18-9-C632.C. New or reissued permits, and to the extent allowed under R18-9-C632 modified or revoked and reissued permits, shall incorporate each of the applicable requirements referenced in this Section.D. All permit conditions shall be incorporated either expressly or by reference. If incorporated by reference, a specific citation to the applicable regulations or requirements must be given in the permit.E. Permits shall provide language on duration, expiration and termination.Ariz. Admin. Code § R18-9-D636
New Section made by final rulemaking at 28 A.A.R. 1904, effective 9/6/2022.