Current through Register Vol. 30, No. 50, December 13, 2024
Section R18-9-C623 - Response to CommentsA. At the time that any final permit is issued under R18-9-C627, the Director shall issue a response to comments. This response shall: 1. Specify which provisions, if any, of the draft permit have been changed in the final permit decision, and the reasons for the change; and2. Briefly describe and respond to all significant comments on the draft permit raised during the public comment period, or during any hearing.B. The response to comments shall be available to the public.Ariz. Admin. Code § R18-9-C623
New Section made by final rulemaking at 28 A.A.R. 1903, effective 9/6/2022.