Section R18-9-A208 - Compliance ScheduleA. A permittee shall follow the compliance schedule established in the individual permit. 1. If a compliance schedule provides that an action is required more than one year after the date of permit issuance, the schedule shall establish interim requirements and dates for their achievement.2. If the time necessary for completion of an interim requirement is more than one year and is not readily divisible into stages for completion, the permit shall contain interim dates for submission of reports on progress toward completion of the interim requirements and shall indicate a projected completion date.3. Unless otherwise specified in the permit, within 30 days after the applicable date specified in a compliance schedule, a permittee shall submit to the Department a report documenting that the required action was taken within the time specified.4. After reviewing the compliance schedule activity the Director may amend the Aquifer Protection Permit, based on changed circumstances relating to the required action.B. The Department shall consider all of the following factors when setting the compliance schedule requirements: 1. The character and impact of the discharge,2. The nature of construction or activity required by the permit,3. The number of persons affected or potentially affected by the discharge,4. The current state of treatment technology, and5. The age of the facility.C. For a new facility, the Department shall not defer to a compliance schedule any requirement necessary to satisfy the criteria under A.R.S. § 49-243(B).Ariz. Admin. Code § R18-9-A208
New Section adopted by final rulemaking at 7 A.A.R. 235, effective January 1, 2001 (Supp. 00-4). Amended by final rulemaking at 11 A.A.R. 4544, effective November 12, 2005 (05-3).