Ariz. Admin. Code § 18-5-506

Current through Register Vol. 30, No. 45, November 8, 2024
Section R18-5-506 - Compliance with Approved Plans

All construction shall conform to approved plans and specifications. In order to make a change in an approved design that will affect water quality, capacity, flow, sanitary features, or performance, a public water system shall submit revised plans and specifications to the Department for review, together with a written statement regarding the reasons for the change. The public water system shall not proceed with the construction affected by the design change without written approval from the Department. Revisions not affecting water quality, capacity, flow, sanitary features, or performance may be permitted during construction without further approval if record drawings documenting these changes, prepared by a professional engineer registered in Arizona, are submitted to the Department under R18-5-508.

Ariz. Admin. Code § R18-5-506

Section recodified from R18-4-506 at 10 A.A.R. 585, effective January 30, 2004 (Supp. 04-1).