All sewage treatment facilities, including an expansion of a facility, shall, before construction, conform with the Certified Areawide Water Quality Management Plan, Facility Plan, and General Plans as specified in subsections (1) and (2).
1. The Department shall make the determination of conformance if the sewage treatment facility or expansion of the facility conforms with the Certified Areawide Water Quality Management Plan and Facility Plan that prescribe a configuration for sewage treatment and sewage collection system management by a designated management agency within the service area.2. If the condition specified in subsection (1) is not met, the Department shall make the determination of conformance as follows:a. If no Facility Plan is applicable and a Certified Areawide Water Quality Management Plan as described in subsection (1) is available, the Department shall rely on the Certified Areawide Water Quality Management Plan for the determination of conformance.b. If no Certified Areawide Water Quality Management Plan as described in subsection (1) is available, the Department shall make the determination of conformance based on conformance with applicable General Plans and after conferring with the designated water quality planning agency for the area and any responsible and affected governmental unit.Ariz. Admin. Code § R18-5-303
New Section adopted by final rulemaking at 7 A.A.R. 559, effective January 2, 2001 (Supp. 01-1).